AMC Pompano 18
Reseat and refresh of an 18-auditorium theater to new auditorium platforms with power recliners, new floor and wall coverings including adding specialized “Prime” auditorium. Updated the concession and lobby area to include adding a bar and lounge area. Removed a 10-ton sign that was discovered to be structurally unstable during renovations. All renovations were complete while the theatre remained in operation under an extremely tight schedule.